GNOME Bugzilla – Bug 323042
Task summary column not available
Last modified: 2013-09-10 13:52:53 UTC
Please describe the problem: The Task summary column is not shown in the Task window list view, nor in the Calendar window task list. Additionally, the summary column is not available to add to the view with the "Add a column" widget. Steps to reproduce: 1. Start Evolution. 2. Switch to the Task view. Actual results: Only the "Due date" and "Completion date" columns are shown. Expected results: Summary column should be available and shown by default. Does this happen every time? Yes. Other information: See screenshot.
Created attachment 55534 [details] Evolution opened to the task window
Instead of "Summary" it displays "Completion date" for me. Using "Customize View" I do have the Summary column and can move it, but it is the Completion date in the list always. Confirmed. Bumping whatever I can. Blocker. GAR.
This bug is introduced since 2.4.2. Just built 2.4.1 again, and this works as expected.
Fixed and will be available in 2.4.2.1