Project wide configuration option for type of tasks (work or time fixed)
Last modified: 2021-06-09 20:32:35 UTC
I would like to have a project or planner wide setting to establish if new tasks are going to be work based or time based (fixed). I think that MS Project has it. If you don't have that possibility, you end up changing every task to set it as duration fixed.